Insulator Post And Insulator Suspension

Overview

Setting up a manufacturing and assembly plant to produce Insulator Post and Insulator Suspension in KSA

  • Expected investment size of USD 5-15 Mn
  • Expected IRR: 9%
  • Opportunity to consider different operating models – pure private sector model or joint venture with local player
  • Expected timeline to setup the manufacturing and assembly plant is 3-4 months
  • Estimated cumulative distribution HV (High Voltage) substations capacity target (KSA – 188K MVA) and cumulative transmission substations capacity target (KSA – 214K over 10 years